Many AI risk assessments rest on one quiet argument: the model cannot do X, so control Y is not needed. That is a capability assumption, a statement about what a model is unable to do, used to decide which risks need controls. It has a shelf life. METR, an independent research group that evaluates AI systems, has just retired the same argument for itself.
METR has dropped the argument
In its capability update of 20 November 2026, METR states that it can no longer argue risk is very low on the grounds that public frontier models cannot perform verifiable software tasks. A frontier model is one of the most capable models available at the time; "public" means anyone can use it. A verifiable task is one whose success can be checked quickly and automatically, such as code that passes its tests. METR reports that these models can hack services, reason about how they are graded and bypass sandbox restrictions. A sandbox is a closed environment meant to stop software reaching other systems.
An argument from incapability says "the model cannot do this, so the risk is low". It was a reasonable argument while it was true. When the organisation that evaluates frontier models stops using it, a risk register that still relies on it needs a second look. A risk register is the list of an organisation's risks, with an owner, a rating and the controls that reduce each one.
Say a register entry reads: "Model cannot carry out a multi-step intrusion, so outbound network access from the agent environment is not restricted." That sentence was written about one model at one date. METR's update says the class of model it describes can now hack services and bypass sandbox restrictions. The control the sentence waived is the one now needed.
The pace behind it
METR measures progress as a time horizon: the length of task, measured by how long it takes a skilled human, that a model can complete at a set success rate. A task suite is a fixed collection of tasks used for that measurement. On METR's combined TH1.1 and TH2 suites, time horizons double roughly every 3.6 months. Models saturated the TH1.1 suite, with tasks up to 30 hours, within a year of the March 2025 baseline of around one hour.* Saturated means models complete nearly all of its tasks, so the suite can no longer tell them apart.
Imagine an assumption tested in January against tasks a skilled person needs two hours for, and found to hold. If the reported trend held, the horizon would reach about four hours a little over three months later and about eight hours some seven months later. Over a year, doubling every 3.6 months comes to roughly a tenfold increase. An assumption tested once a year can end the year describing a model whose time horizon is about ten times the one it was tested against.
Where the gap remains
The update also records a limit. METR finds that agents show worse judgement than human experts on tasks without clear, fast feedback. An agent is an AI system that takes actions to complete a task. Clear, fast feedback is a signal that tells you quickly whether you were right, such as a test that passes or fails.
That gives a risk assessment a working rule. Separate verifiable tasks from judgement-heavy tasks. For verifiable tasks, assume the model can do them, or soon will. For judgement-heavy tasks, test; do not assume in either direction.
Before and after: before, a register treats "find and use a known weakness in our web service" and "decide whether a supplier contract exposes us to liability" the same way: "model not capable, low risk". After, the first is marked verifiable, so the register assumes the model can do it and puts the network control in place. The second is marked judgement-heavy, so the register records a test on the organisation's own contracts, with a date and a result, before any reliance is placed on the model either way.
FIG. 1.0 — Two kinds of task, two rules
Control 1: the assumption log
Every "the model cannot" statement in a risk register becomes a dated entry naming the model version and the test that supports it. The model version is the exact release the test ran on, not the product name. The test is what was run, on what material, with what result.
Before and after: before, the register says "Model cannot exfiltrate data through tool calls." After, the assumption log says: Assumption the model cannot move data out through its tool calls in our agent set-up; Model version the exact release identifier; Tested 4 March 2026; Test 20 attempts on the staging environment with planted dummy records; Result 0 of 20; Re-test trigger any model upgrade or provider switch; Owner a named person. Exfiltrate means move data out of an organisation without permission. The dates, counts and set-up are illustrations; the fields are the control.
Control 2: the re-test trigger
A model upgrade or a provider switch reopens every capability assumption tied to it, outside the annual review cycle. A provider switch is moving the same use case to another company's model or another company's hosting of it.
Say an organisation tests its assumptions in January and reviews the register each January. Its vendor upgrades the model in April and again in September. Without a trigger, from April onwards the register describes a model no longer in service, and nobody has tested the one in use. With the trigger, each upgrade reopens the linked entries, the tests run again within the upgrade window, and the log shows a fresh date beside each one.
FIG. 2.0 — One capability assumption, from log to re-test
Why we write about this
We write and audit AI risk assessments and control registers, and stale capability assumptions are among the first gaps we find. They are easy to miss because they read as facts. Nothing on the page shows that the fact was true of a model the organisation no longer runs.
Say a register holds 30 entries. Four of them waive a control on the grounds that the model "cannot" do something. None names a model version or a test date. Each of the four is a control that may be missing today, and the register gives no way to tell. The numbers are an illustration of the pattern, not a client finding.
What to do this quarter
Pull every capability assumption out of your risk register this quarter, date it, and attach a re-test trigger to each model upgrade. A three-step plan:
- Search the register and the risk assessments behind it for "cannot", "unable", "not capable" and "too limited", and copy each hit into an assumption log.
- For each entry, record the model version and the test behind it. Where there is no test, mark the entry untested and treat the control it waived as needed until a test says otherwise.
- Link each entry to the models it depends on, so the next upgrade or provider switch reopens it.
Imagine the result at the end of the quarter: every "cannot" in the register points to a model version, a date and a test, and every one of them will come back for a re-test the next time the model changes. That is a register that stays true between annual reviews. Our AI governance service builds and audits it with you.
